What to Spec for Freight Terminal Roll Up Doors

Freight terminal doors get decided on the drawings, long before anyone hangs one. The architect specs the door, usually from manufacturers they already trust. When the developer wants a specific brand, the architect specs that brand instead. Either way, the choices made at the design stage decide how smooth the install goes.

This guide covers what to plan for when you spec roll up sheet doors at an LTL terminal or cross-dock. It draws on the 1270 Series, SteelBlue's heavy duty commercial door, and on what our engineering team sees in the field. Dock doors typically run 9' wide and 9' to 10' tall, per dock equipment maker Blue Giant. The 1270 fits those openings and goes up to 14' x 14'.

Seven things matter most: the clearance around the opening, side room for the operator, the wall the door mounts to, how the door lifts, the wind load rating, the dock equipment around it, and the maintenance plan.

1. Plan the room around the opening, not just the opening

The opening size is the easy part. Fit depends on the building. The axle, T-brackets, and guides all sit outside the opening, so the wall needs room above and beside it.

Headroom for the 1270 depends on opening height. The same figure applies to vertical and horizontal headroom.

  • Openings through 8'-0": 21" of headroom
  • Over 8'-0" through 10'-0": 22" of headroom
  • Over 10'-0" through 14'-0": 24" of headroom

Side room depends on how the door operates. All dimensions run from the edge of the opening.

  • Push-up: brackets sit 6-1/2" out on both ends.
  • Chain hoist or electric operator: brackets sit 10" out on the drive end and 6-1/2" out on the non-drive end.
  • Axle ends, every operation type: 12" on both sides.

The safe rule: plan for 12" of clear side room on both sides of every opening. Source: 1270 Installation Guide, page 5.

For the drawings themselves, DASMA publishes standard rolling door details for plans and specs in TDS 265, Standard Rolling Door Architectural Details.

2. Side clearance is the most common field issue

Ask our engineers what goes wrong at install, and the answer is side clearance.

The reason? SteelBlue commercial doors are ambidextrous. A chain hoist or electric operator mounts on either side. To allow for that, the axle and mounting plates come wide enough to work on both ends. On the side without the hoist or operator, extra axle pipe sticks out past the bracket, along with about half of a mounting plate that goes unused.

Drawings that only show the bracket width miss that extra length. Then whatever sits beside the opening gets in the way. Plan the full 12" on both sides to avoid having an issue in the first place.

3. Name the wall type on the order

The 1270 mounts to steel, masonry, and wood jambs. What changes is the hardware, so state the jamb material when you order so that we can ship the correct fasteners with the door.

  • Steel jambs: mounting plates attach with carriage bolts, and the door brackets bolt to the plates.
  • Wood jambs: mounting plates attach with lag screws.
  • Concrete or filled block: the door brackets mount straight to the flush wall with wedge bolts, no plates needed.

Whatever the wall, every bracket fastener has to land in a structural member. Check that the jamb face is flush and plumb before the door arrives.

In tilt-up concrete and CMU walls, watch the rebar. Reinforcing steel can land right where the jamb fasteners need to go. DASMA TDS 259 recommends keeping vertical reinforcement within 2" of each wall corner at the jamb and at least 6" from the edge of the opening. That leaves a clear zone for the door's fasteners. Where no door drawings exist yet, it suggests 8" from the opening.

4. Doors over 10' need a lifting mechanism

Any door over 10' in width or height needs a chain hoist or motor. That's the industry standard. A 9' x 10' dock door sits right at that line, so check each opening. Taller or wider doors need one.

The 1270 offers three options:

  • 4:1 chain hoist
  • 8:1 chain hoist
  • EO (electric operator adaptor) kit, for projects that supply their own motor

Pick the operation early. It sets the side room on the drive end, 10" for a hoist or operator versus 6-1/2" for push-up.

5. Check the wind load rating for the door width

The 1270 Series is wind load rated for doors up to 10' wide, which covers the 9'-wide doors most docks use. For wider openings, the 1250 Series is rated up to 14' wide. Both are tested in accordance with ANSI/DASMA 108 for high wind load zones.

The pressure tables on each door's engineer-stamped drawings list the allowable design pressure at each width, for reference during the permit approval process. Here are the 1270's:

  • 6'-0" wide: +31.1 / -35.3 PSF
  • 7'-0" wide: +26.9 / -30.6 PSF
  • 8'-0" wide: +23.7 / -26.9 PSF
  • 8'-8" wide: +22.0 / -25.0 PSF
  • 9'-0" wide: +20.4 / -23.2 PSF
  • 10'-0" wide: +16.7 / -19.0 PSF

Compare these numbers to your project's design pressures, and design the jambs to resist them.

6. Line up the door with the dock equipment

Terminal doors usually sit among levelers, seals, shelters, and bumpers. The 1270 works alongside them as long as one condition holds: the bottom of the door has to align with the bottom of the guides.

When it does, the latch slots line up and the door locks the way it should. So check two things on the dock drawings. Set the guides to finish at the same elevation the curtain closes to. Keep levelers clear of that line so nothing stops the bottom bar from seating.

7. Put maintenance in the turnover documents

A terminal door opens and closes frequently. Anything that moves needs routine service and inspection to keep it working properly.

  • Quarterly, at a minimum: a visual inspection by the people who use the door every day, plus a simple cycle test, opening and closing the door to confirm everything works properly.
  • Annually, or whenever the door doesn't operate properly: a full inspection and service by a trained door systems technician, including cleaning the guide wear strips, a light silicone spray, and checking set screws and spring tension.

Improper operation comes from a damaged part, improper use, or general wear over time. Don't modify or adjust any part of the door unless you're a trained door systems technician. Properly maintained, a SteelBlue roll up door provides decades of service. Add this schedule to the owner's operation and maintenance package so the facility team has it on day one.

For more detail, see the 1270 Installation Guide and DASMA TDS 286, Rolling Sheet Door Maintenance and Performance Evaluation, on DASMA's technical data sheets page.

Quote checklist

Send these five items with your request to help our team quote the right door the first time.

  1. Opening width and height for each door
  2. Jamb material: steel, masonry, or wood
  3. Available headroom above each opening
  4. Available side room on both sides of each opening
  5. Operation: 4:1 chain hoist, 8:1 chain hoist, or EO kit for your own motor

The 1270 is built in Georgetown, Kentucky, from 26-gauge Grade 80 steel with 14-gauge galvanized guides and an aluminum bottom bar. Ready to spec a terminal? Request a quote with your drawings.

Sources

Brad Astolos
Vice President of Engineering

Brad Astolos serves as Vice President of Engineering for SteelBlue Building Components. Brad has been part of SteelBlue since the company began, and he designed and engineered its entire product line, from roll-up doors to hallway systems.

Before SteelBlue, Brad worked in the government sector. He brought that experience to the door industry and quickly became a leader in door and hallway system design. Today he is SteelBlue's in-house expert on every product the company makes, because he designed them.

Outside of work, Brad is into action sports and motorsports, from BMX to motorbikes.

Find me on LinkedIn